0
0
Read Time:19 Second
Phase 1 of playground area expansion is almost complete. The wall is down and asphalt taken up. The entire area will be turf with a surrounding wall providing more space for the students’ soccer, football, and volleyball games during recess. This will also make it possible for PE to have class outside sometimes during Arizona”s cooler months.
Stay tuned for pictures of progress.
Average Rating